Commission on agriculture, agrarian and land issues - 4 deputies. Commission Chairman - M. Musaev.
Organizations providing public services in the city
# |
Organization |
Number of employees |
1 |
City self government |
32 |
2 |
Municipal property department at the city self government |
4 |
3 |
Rayon state administration and rayon kenesh |
30 |
4 |
Rayon culture division (including library and culture house personnel) |
33 |
5 |
Rayon architecture and construction division |
12 |
6 |
Rayon social protection department |
41 |
7 |
Rayon Social Fund department |
20 |
8 |
Rayon education division |
15 |
9 |
United oblast hospital |
287 |
10 |
Rayon employment center |
6 |
11 |
Rayon department of property rights registration (Gosregister) |
19 |
12 |
Inter-rayon prosecutor''s office |
11 |
13 |
Rayon court |
9 |
14 |
Rayon civilian registry office |
2 |
15 |
Rayon archive |
2 |
16 |
United city military registration and enlistment office |
21 |
17 |
Rayon sanitary and epidemiological station |
37 |
18 |
Rayon tax office |
25 |
19 |
Rayon agriculture department |
8 |
20 |
Rayon land department |
19 |
21 |
Rayon veterinary department |
15 |
22 |
Rayon statistics committee |
8 |
23 |
Rayon finance division |
6 |
24 |
Rayon treasury division |
5 |
25 |
Rayon center of agrarian and land reform |
5 |
26 |
Rayon water department |
162 |
|
TOTAL |
834 |
Public utilities
|
Utilities |
Personnel |
Type of ownership |
1 |
"Gorvodokanal" utility |
25 |
municipal |
2 |
"Batken kommunalshik " JSC |
11 |
95% of stocks are at the city self government disposal and 5% are owned by the JSC collective |
MAIN PROBLEMS:
1. Lack of specialized machinery (cesspool emptying trucks, watering machines, refuse loading machines, etc.)
2. Water supply and sewage networks are worn out.
3. Establishment and development of condominiums in the city.
4. PUBLIC SERVICES
4.1. HEALTHCARE
The united oblast hospital provides services to the city and oblast residents. Outpatient care is provided by five groups of family practitioners (GFP) and three centers of medical assistance and obstetrics (CMAO).
Batken healthcare establishments
The united oblast hospital has 350 beds, ?? hospital - 180, outpatient''s clinic - 250 visits. There are five GFPs, three CMAOs and six drugstores in Batken.
The city healthcare establishments have only 66 % of the required medical personnel. There are four pediatricians, two children''s doctors, four - general practitioners, three gynecologists and two dentist vacancies.
MAIN PROBLEMS:
1. The healthcare institutions lack about 20 % of the required equipment, including lab equipment, and they
lack about 20 % of the required medicines. Annually about 100.0 thousand soms are allocated for these
purposes but the required amount should be in the region of 800.0 thousand soms.
2. In order to improve healthcare services it is necessary to establish two GFPs in "Bulak-Bahy" district and in
"Chet-Bulak" residential area. It is necessary to construct a CMAO in "Balik-Bashy" district and equip it
appropriately.
4.2. EDUCATION
The rayon education establishments division jointly with the local self-government manages the public education.
Educational establishments and number of children
# |
Type |
Seats /children |
1 |
Schools - 6 of them: secondary schools - 5 elementary school - 1 high school - 1 |
3945 / 4878 3500 / 4382 45/58 400 / 438 |
2 |
Kindergartens- 2 |
280 / 372 |
Educational establishments and number of students (higher education establishments specialized Education establishments, vocational lyceums)
# |
Educational establishment type |
Number of students |
1. |
Batken State University. 141 teachers are employed, including two professors -Doctors of Science, 13 assistant professors - Candidates of Science. There are 14 professions taught here. |
2490 |
2 |
The Law Academy branch. There are 3 professions taught here. |
235 |
3 |
Vocational lyceum # 57. Four trades are studied here. |
195 |
Out-of-school establishments:
Physical training club for children and youth: 4 groups - 120 children; "Meyerim"- Children''s education center: 6 groups - 132 children.
MAIN PROBLEMS:
1. About 80% of school buildings need capital repairs. Also, additional classrooms have to be constructed in
three secondary schools and one elementary school.
2. Schools are not property furnished and supplied with textbooks and equipment.
3. Teachers and technical staff are not paid in a timely manner.
4. Educational establishments are not adequately manned with skilled personnel for reasons of low pay and
lack of career development prospects.
4.3. CULTURE AND SPORTS
In Batken there is a centralized rayon library, a children''s library and five school libraries. There are about 20,000 books available in these libraries. In addition, there is a movie theater, rayon Culture House, musical school for 70 students, central city park, culture and recreation park, five children''s play grounds, dancing ground, four clubs and seven hobby groups.
MAIN PROBLEMS:
1. The rayon Culture House capital repair work needs to be completed.
2. The city culture and recreation park improvement works needs to be completed.
3. It is necessary to improve the central city park, decorate it with small-size architectural constructions and
build attractions.
4. It is necessary to construct a building for the oblast TV studio.
5. It is necessary to create ten children''s playgrounds.
6. It is necessary to construct buildings for children''s and rayon libraries.
7. It is necessary to construct a musical school building for 100 children.
8. It is necessary to construct a building for the regional museum.
SPORT CONSTRUCTIONS in the city:
- The central stadium, seating 400 people
- Open air swimming pool
- Five school sports grounds
- Three school gymnasiums
- Four sport sections (basketball, boxing, wrestling, football)
MAIN PROBLEMS:
1. Lack of sports equipment;
2. It is necessary to perform capital repairs of three school gymnasiums;
3. It is necessary to complete the construction of sports facilities at the city Central stadium;
4. It is necessary to construct three school gymnasiums;
5. It is necessary to build two open swimming pools;
6. It is necessary to create three sports grounds in the densely populated residential areas of the city.
4.4. HOUSING SECTOR
The total area of the city housing resource is 307.9 thousand square meters. There are 445 (13,820 sq. m) apartments in multi-storied buildings and 4804 (288,240 sq. m) private houses.
The average total dwelling area per individual is - 13.2 sq. m. At present 1200 land parcels are needed for the construction of individual houses, i.e. about 144.0 thousand sq. m. Of the 17 multi-storied apartment buildings in the city, 12 are serviced by "Batken Communalshik" JSC. The remaining five houses are properties in abeyance. There have been several attempts to establish condominiums but they have failed.
MAIN PROBLEMS:
1. Large amounts of money are owed by the population to service providing entities (for residential building
maintenance and usage);
2. Lack of funding for capital repairs of multi-storied apartment buildings and engineering infrastructure.
4.5. SOCIAL PROTECTION
The Batken rayon social protection department and social division of Batken city local self government are responsible for implementing republican, oblast and city level programs of population social support.
The city self-government develops Programs to support low-income families by providing them with money to pay public utility and electricity bills. It also develops healthcare programs. But it will be impossible to implement these programs in the near future due to a lack of funds in the city budget.
In 2003 the city residents received 1870.0 thousand soms in assistance from the republican budget, 54.0 thousand soms - from the oblast budget and about 100.0 thousand soms - from the city budget.
Socially vulnerable population by category, including: |
4355 people or 18.7% of the population |
Poor people (low income) |
1832 |
Pensioners |
1512 |
Disabled |
384 |
War and labor veterans |
89 |
Single mothers |
176 |
Orphans |
2 |
Children with one parent only |
282 |
Chernobil disaster liquidation participants |
8 |
Afghanistan war participants |
24 |
Single widows |
2 |
Single elderly people |
30 |
Other categories |
78 |
Poverty level in 2003-2004
? |
Status |
Families / people |
% |
1 |
Very poor families with incomes up to 400 som |
602 / 2285 |
9.8 |
2 |
Poor families with incomes up to 600 som |
1204/4575 |
19.6 |
MAIN PROBLEMS:
1. It is impossible to provide employment to all those who need it.
2. It is necessary to build a center of rehabilitation and disease prevention for disabled children.
3. It is necessary to establish a boarding house for single old people.
4. It is necessary to establish a city micro-crediting center for the socially vulnerable population.
5. It is necessary to create a city center for disease prevention and social servicing for the socially vulnerable.
6. It is necessary to establish free meal centers, including a "dairy product kitchen for infants".
4.6. POPULATION EMPLOYMENT
The city able-bodied population is 10,200 people. The actual number of actively employed is 4876 or 47.8% of the total of able-bodied population. Currently, 1479 people are registered in the rayon Employment Center. The official unemployment rate in the city is 14.5%.
The Table below shows the funding allocated to support the city unemployed by the micro-crediting, banking and other organizations.
New job creation forecast for Batken city
# |
Indicator |
2004 |
2005 |
2006 |
|
Total jobs, including |
135 |
145 |
160 |
1 |
At enterprises |
15 |
17 |
20 |
2 |
As a result of small to medium business development |
52 |
54 |
57 |
3 |
As a result of agriculture development |
26 |
28 |
31 |
4 |
As a result of foreign investments |
4 |
4 |
5 |
5 |
As a result of Employment Fund activity |
31 |
33 |
36 |
6 |
As a result of private business activity |
6 |
7 |
8 |
7 |
At the expense of the local budget |
1 |
2 |
3 |
|
Total: |
270 |
290 |
320 |
Basic measurement forecast of labor market in Batken city for 2004 - 2006
? |
Indicators |
2003 |
2004 |
2005 |
1 |
Labor resources, people |
10200 |
10300 |
10500 |
2 |
Employed population, people |
4876 |
5050 |
5500 |
3 |
Jobs provided, people |
220 |
230 |
240 |
4 |
Vocational training, people |
40 |
45 |
50 |
5 |
Public paid work |
125 |
135 |
140 |
6 |
Micro-credit, people |
92 |
105 |
120 |
7 |
Benefit, people |
280 |
300 |
310 |
|
Total: |
15833 |
16165 |
16860 |
4.7. WATER SUPPLY
Batken "Vodokanal" municipal utility is a specialized enterprise providing clean drinking water to the city economic entities and population and wastewater treatment. The total number of its consumers is 5249, of them budget organizations make up - 85, population - 4970, commercial organizations - 194. The water consumption norm is 940.5 m3 / day.
Water tariffs:
? population - 2.85 som (excluding VAT);
? budget financed organizations - 3.43 som (excluding VAT).
Electricity tariff- 0.60 som (excluding VAT)
One of the major problems the local government is facing is providing the population with clean drinking water. Despite the fact that the useful life of the water supply and sewage pipelines, and other infrastructure expired some 15 - 20 year ago, there has been no overhaul performed thus far. As of 01.07.2004 only two out of nine water wells were operating. It is impossible to use the other seven, as the deep well pumps are broken, the same is true about the substations, well casing and other parts.
The "Vodokanal" municipal utility has a large bill of 2776.6 thousand soms outstanding payable to the Batken Electric Transmission Lines, a bill of 739.7 thousand soms payable to the Social Fund, 19.9 thousand soms payable to the state tax office, salary and wage debts of 231.7 thousand soms. At the same time the water consumer debt payable to the water supply utility for the period from 2001 to 2004 was 810.2 thousand soms. There are several reasons that account for these debts payable to "Vodikanal". They are: the low level paying ability of the city population, inadequate funding provided by the state to the budget financed organizations and institutions (for water consumption) and the city budged deficit. Given the current situation, characterized by lack of appropriate financial resources, the "Vodokanal" utility only repairs the network in cases of emergency. Recently, a bankruptcy process has been initiated by the creditors of the "Vodokanal" against this municipal utility.
At present, there is a debate as to whether the maintenance and operation of the water supply and sewage system should be transferred to "Batken taza suu" - the Rural Public Association of Potable Water Consumers (RPAPWC). "Batken taza suu" consists of five district potable water consumer associations - - Airport, Bazar -Bashy, Kyzyl - Jol, Kelechek, and Kyzyl - Don.
In order to improve the drinking water supply of the population, Batken city local self-government jointly with the Oblast Water Department has developed a project for the city water supply system rehabilitation. This Project has been submitted to the ADB (Asian Development Bank) as part of the Project of "Rendering infrastructure services to built-up area level" that is being implemented. Under this Project a 25.7 km long waterway is to be laid from the "Karakol" area to Batken city. Metal pipes (D=219mm) will be used. It is also planned to construct a 25 km long water pipeline in the city and to undertake the rehabilitation of the existing water supply system.
The Project was supported by the ADB. For the purpose of implementing this Project proposal an agreement was signed on September 2, 2003 between the Ministry of agriculture and processing industry of the KR, acting as the General Client, and the "Community" Consortium, acting as a General Contractor. In accordance with the conditions of the Agreement and the ADB-172-BA-RW-001-HB Contract, the Contractor shall construct a "Batken" water supply system. The Project cost is 46.950 million som (excluding taxes). The total contract cost (including taxes) is 55.237 million soms.
MAIN PROBLEMS:
1. Eight deep well pumps need replacement;
2. 560 meters of high-tension cable and 6 control panels have to be replaced;
3. Three transformer substations need overhauling and it is necessary to purchase two more;
4. 18 km water pipeline needs overhauling;
5. 15 km water pipeline has to be reconstructed;
6. It is required to install 125 hydrants;
7. It is necessary to repair and install 12 bactericidal plants;
8. It is required to construct and equip a water-testing laboratory.
4.8. SEWAGE
The city sewage system is maintained and operated by the "Vodokanal" municipal utility. The total number of its consumers is 1120. The treatment plant (three units of KU - 200 type) was constructed in 1976. All the units of the treatment plant are non-operating. The treated water is discharged into the drainage canal and the treated sewage is not disinfected.
MAIN PROBLEMS:
1. It is necessary to overhaul two KU-200 treatment units;
2. It is required to install two more KU-200 treatment units;
3. It is required to overhaul the treatment plant operation building;
4. It is necessary to construct a new building for chlorination;
5. It is required to purchase two chlorination plants of LONI-100 type; ten liquid chlorine cylinders; two
electric motors of rotation type for the blower;
6. It is necessary to install a transformer substation of TP - 160 type;
7. The existing 7.5 km long sewage network and 70 manholes need reconstructing and overhauling.
4.9. POWER SUPPLY
The city is supplied with power by the Batken RES of "Oshelectro"Open Type JSC. The length of the city 6 kilovolt overhead transmission lines is 32.0 km, 0.4 kilovolt overhead transmission lines are 52.0 km long, 6 kilovolt cable lines ? 12 km, 0.4 kilovolt cable lines - 19 km. The number of the operating transformer substations is - 67.
We have no data on the Batken RES receipts and expenditures as it reports to "Oshelectro"Open Type JSC. The population tariff is 0.60 som per 1 kWh (VAT exclusive).
MAIN PROBLEMS:
1. It is necessary to overhaul the 4.5 km of power transmission lines.
2. It is required to install 25 additional transformer substations.
3. It is necessary to overhaul the 7 km street lighting and install two additional transformer substations.
4.10. COMMUNICATION
Telecommunication services are provided by the Batken division of "Kyrgyztelecom" JSC. It is servicing 2065 numbers. Of them: 1700 are analog and 365 are digital numbers. There is an automatic switching center in the city, Central Post Office and two district post offices in "Bazar-Bashy" and "Kelechek" districts.
MAIN PROBLEMS:
1. It is necessary to construct an automatic switching center for 2500-3000 digital numbers.
2. It is necessary to provide mobile communication service
3. A central trunk-call office has to be built.
4. It is necessary to build a new post office in "Kyzyl-Jol" district.
4.11. HEATING
All the enterprises and organizations of the city have been transferred to autonomous electric heating.
4.12. SOLID GARBAGE
As the city lacks garbage containers and special garbage disposal areas, its dwellers have to dispose of their garbage at places that do not suit for this purpose. As a result there appear spontaneous garbage disposal sites and during windy weather episodes garbage is blown about the neighborhood. These circumstances make the city look particularly dirty and there may result in an outbreak of infectious diseases.
Solid garbage disposal service is provided by the "Batken-communalshik" JSC, that is servicing multi-storied house districts. It also provides this service to some organizations and institutions at an agreed price. The rest of the city territory is cleaned by the local population and organizations. The garbage dump is located in the Northwest of the city, some 4.5 km from the center, and is within the precincts of the city. The running and financial responsibility of the dump belongs to Batken self-government.
MAIN PROBLEMS:
It is necessary to take the following steps in order to improve the sanitary condition of the city and ensure solid garbage disposal:
1. create special garbage areas -10 to 15 areas;
2. purchase 25-30 garbage containers;
3. purchase a container carrying truck (GAZ - 53);
4. purchase a garbage loader (JMZ tractor).
4.13. TRANSPORT
Transportation companies'' operation is supervised by the Oblast Transport Inspectorate. Passenger haulage tariffs are agreed with the Oblast Department of Antimonopoly Policy.
Two motor transportation companies - "Batken" JSC and "Batkentrans" state enterprise - carry out passenger transportation on suburban routes.
"Batken" JSC. Activity type - passenger haulage. It has 29 buses and provides transportation services on 2 long distance and 13 suburban routes.
Every day a large private bus and three mini buses start from Batken to Osh, and one mini-bus from Batken to Isfana.
From April 2004, "Altin Air" Airlines has three passenger flights a week. They use small planes on Batken - Bishkek route. In addition, the same Airlines run a charter flight from Batken - Bishkek - Urumchy (China) once a week.
MAIN PROBLEMS:
1. Unstable fuel prices.
2. Lack of spare parts and components.
3. Lack of funding for purchasing new vehicles. The average age of motor transport is 12-15 years.
4.14. ROADS
# |
Batken road industry |
Number, measurement unit |
1 |
Year of asphalting roads: I- 1st phase -1957 II-2nd phase -1964 III-3rd phase -1981 |
2.8km 3.6km 7.6km |
2 |
Total length of streets, including: ? Asphalted roads ? Dirt roads |
68km 14km 54km |
3 |
Length of in-city irrigation network |
69km |
4 |
City bridges |
5 |
5 |
Street lighting length |
10.5km |
6 |
Sidewalk length |
32km |
7 |
Number of public transport stops |
16 |
Within the period of 1996-1997 the entire inner city road infrastructure was transferred to the balance sheet of local self-government. It has been gradually deteriorating because of the lack of funding for road maintenance. In particular, within the last two to three years the structures of the four public transport stops have had to be dismantled for reasons of passenger safety. Road potholes and bumps, particularly on the central streets, create accidents and prevent normal traffic flows.
There is practically no street lighting in the city. It is only during some festivities that part of Nugazyev Street from the Central Stadium to T. Sadikov Street is lit. Installation works are performed by the local RES as there is no specialized equipment in the city.
Currently, road works are carried out at the expense of the republican and oblast budget. 2.5 km of the central streets - Nurgazieva and Sidikova - are being asphalted. The total budget is 6.0 million soms. The cost for all of the streets repairs is 70 million som.
MAIN PROBLEMS:
1. It is necessary to perform capital repairs of asphalted roads, the total length is 14 km;
2. It is necessary to perform capital and repairs of dirt roads, the total length is 32 km;
3. It is required to install 55 "cobra" type street lamps;
4. It is required to repair the irrigation system and build 25 km of reinforced concrete troughs;
5. It is necessary to perform capital repair works and expand the roadway of three bridges;
6. It is required to carry out capital repairs of 12 public transport stops.
4.15. MARKETS AND DISTRIBUTION OPPORTUNITIES
The following markets operate on the city territory:
# |
Name |
Number of people working at the market |
Type of ownership |
1 |
Central city market |
240 |
Rayon Association of Consumer Union |
2 |
"Ak-Orgo" mini-market |
75 |
Rayon Association of Consumer Union |
3 |
"Ak-Batken" wholesale market |
15 |
Private |
4 |
Cattle market |
150 |
Rayon Association of Consumer Union |
4.16. ENVIRONMENT
The oblast environment protection department is responsible for nature and environmental protection of the city. The major nature and ecology protection problem is the subsoil water table level rising. This problem is a very critical one for such districts as "Bazar-Bashy"and "Bulak-Bashy", situated in the lower part of the city, and for "Kyzyl-Jol". This problem is primarily related to the fact that six drainage wells, that were used to raise subsoil water and discharge it into the horizontal drainage system, have broken down. Also, the horizontal drainage system has not been cleaned within the last 15 years. On top of all this, illegal mass tree and bush cutting by the local population has also caused the level of subsoil water rise. The fact that the level of subsoil water has risen considerably, has resulted in negative effects which has caused a residential building slump, the impossibility of some agricultural land cultivation, soil surface salinization, cane and other detrimental plant growth, etc. The approximate cost of repairs and rehabilitation of the city drainage system would be 5.0 million soms.
Another significant problem is the mud dam breaking. The city of Batken is located in the zone of frequent mudslides. There is a river running across the city center. During flood and downpour periods the water in the riverbed turns into a rapid torrent. 3,0 million soms are required to repair the mud dam system.
5. MAIN INDICATORS OF CITY BUDGET
In 2002 the actual budget expenditure was 1879.4 thousand soms and the actual revenue - 1879.4 thousand soms. In 2003 the original adopted revenue plan was 15259.0 thousand soms. The actual expenditure for 2003 was 13245.7 thousand soms, of this amount 37% was spent on education.
Batken city budget revenue for 2002-2004 (thousand soms)
Indicator |
2002 actual |
2003 plan |
2003 actual |
2004 plan |
Local taxes |
|
|
|
|
Fee for garbage disposal |
- |
78.7 |
81.2 |
- |
Tax on vehicle owners |
55.1 |
55.1 |
76.1 |
55.1 |
Land tax payable by individuals |
117.4 |
142.6 |
153.2 |
109.5 |
Land tax payable by legal entities |
86.8 |
177.7 |
179.9 |
86.8 |
Total land tax |
259.3 |
454.1 |
490.4 |
251.4 |
State fee |
1.0 |
1.0 |
1.0 |
1.0 |
Total: Non-tax revenue |
1.0 |
1.0 |
1.0 |
1.0 |
Special funds |
804.5 |
1000.4 |
786.7 |
631.6 |
Total tax and non-tax revenue |
1064.8 |
1455.5 |
1278.1 |
884.0 |
Categorical grants |
369.0 |
5062.7 |
4933.9 |
5198.5 |
Equalization grants |
445.6 |
8314.9 |
6609.2 |
515.5 |
Funds transferred from republican budget |
- |
425.9 |
424.5 |
- |
Transfers |
814.6 |
13803.5 |
11967.6 |
5714.0 |
Total revenue |
1879.4 |
15259.0 |
13245.7 |
6598.0 |
Batken city budget expenditure for 2002-2004 (thousand soms)
Indicator |
2002 actual |
2003 plan |
2003 actual |
2004 plan |
Expenditure by sector |
|
|
|
|
Education |
369.0 |
5653.9 |
5523.7 |
5551.5 |
Total expenditure |
369.0 |
5653.9 |
5523.7 |
5551.5 |
Expenditure by item |
|
|
|
|
Salary and wages |
877.5 |
4878.4 |
4793.3 |
4484.2 |
Social Fund contribution |
219.7 |
1219.8 |
1201.9 |
1121.2 |
Inland traveling expenses |
30.0 |
|
|
11.0 |
Equipment and material procurement |
5.0 |
10.0 |
10.0 |
50.0 |
Nutrition |
|
215.0 |
215.0 |
120.0 |
Transportation costs |
41.0 |
66.0 |
49.0 |
6.0 |
Communal services |
219.6 |
425.9 |
424.5 |
90.0 |
Other purchases and services |
|
7.0 |
7.0 |
34.0 |
Capital repairs |
179.0 |
3356.0 |
1942.3 |
50.0 |
Subsidies |
|
4080.5 |
3816.0 |
|
Special funds |
307.6 |
1000.4 |
786.7 |
631.6 |
Total expenditure by economic classification |
1879.4 |
15259.0 |
13245.7 |
6598.0 |
6.COMMUNAL PROPERTY
25 objects (buildings, constructions, services) are on the balance sheet of the city self government
Indicator |
Years of construction |
Length, km |
Note or book cost |
Asphalted roads |
1957-81 |
14 |
|
Canals, ditch network |
1957-81 |
85 |
|
Sidewalks |
1957-85 |
32 |
|
Bridges, temporary bridges |
1957-85 |
|
5 ?????? |
Squares |
|
|
2 ?????? |
Boulevards |
|
|
1 ??????? |
Cemeteries |
|
|
4 ???????? |
Street light network |
1957-85 |
10.5 |
|
Secondary School named after V.Lenin |
1982 |
|
539.2 |
Secondary School named after J. Bokonbaev |
1970 |
|
456.3 |
Secondary School named after N. Krupskaya |
1978 |
|
136.7 |
Bulak-Bashy Elementary School |
2001 |
|
87.7 |
Secondary School named after S.Ogato |
1998 |
|
1122.0 |
Kyzyl- Jol Secondary School |
1936-76 |
|
266.6 |
"Bazar-Bashy''TAP |
1976 |
|
85.0 |
Kyzyl- Jol FAP |
1976 |
|
41.7 |
"Oruk-Zar" kindergarten |
1972 |
|
56.2 |
"Altin-Beshik" kindergarten |
1971 |
|
78.3 |
"Vodokanal" utility |
1961-84 |
|
1271.0 |
Batken communalshik" JSC |
1967 |
|
297.7 |
City Central Stadium |
1978 |
|
118.0 |
Central culture park |
1984 |
|
207.0 |
Kyzyl- Jol SVA |
1981 |
|
|
Kyzyl- Jol bath house |
1980 |
|
55.4 |
Central boiler house |
1976 |
|
1250.5 |
7. NGOs AND ORGANIZATIONS, ESTABLISHED BY COMMUNITIES
The city is divided into six district committees: Airport, Bazar - Bashy, Bulak - Bashy, Kelechek, Kyzyl-Don, and Kyzyl - Jol.
Seven NGOs have been registered in the city: consumer right protection - 1, aid to children and invalids - 1, participants of the war in Afghanistan - 1, local self government development and support - 1, protection from violence in the family - 1, gender policy - 1, information and resource center - 1.
There are five mosques in the city.
There are 15 community organizations: 3 - in "Kyzyl - Don" district, 2 - in "Kelechek" district, one in each of the following districts - "Bulak - Bashy" and "Airport", and four in each of the remaining districts - "Kyzyl -Jol" and "Bazar - Bashy".